Queen Anne Street

March 9th, 2011

Our thanks goes out to Artesian Developments for the Mechanical Services order which we recently completed for the luxury Flats in Queen Anne St just off Harley St in Central London. The systems installed were Air Conditioning, Ventilation, Hot Water Services, Cold Water Services, Drainage and Controls. The Heating and Air Conditioning is integrated by [...]

Maintenance Case Study – Cost Savings Due to Effective Maintenance

September 16th, 2010

Maintenance Programme A maintenance programme will achieve savings through implementing a high standard of cost reducing maintenance practices which in turn will reduce energy consumption, carbon emissions and ultimately lower operating costs. Comprehensive energy management also requires that building systems be operated and maintained at their best possible operating efficiency. Without proper maintenance these new [...]

Ventilation Case Study – Royal Exchange

September 16th, 2010

Task: To provide a purpose made solution to a commercial kitchen environment located in the prestigious Royal Exchange building located @ Bank in the City of London. This problem was particularly difficult considering the building is grade 1 listed and the restrictions imposed by the Head Landlord and the Local Authority. The building is of [...]

Air Conditioning Case Study – 15th Century Public house

September 16th, 2010

In March 2008 Summit Design was entrusted with the task to provide comfort cooling, heat pump air conditioning to the world famous 15th Century Public house based in the sleepy village of Bray near Maidenhead in Berkshire. The problem with the environment in the pub was that it was extremely hot during the summer months [...]